Brandon Carl
President at Dirty Hands Excavating & Restoration
- Report this post
Proud to announce that we are now an IBEW contractor for Civil Access, Restoration and all Environmental Protection needs in Ohio! Local 71/ 245!Please contact me for any of your needs! No job is to small or to big! #ibew #access #environmental #restoration #transmission #electrical#substation #matting
54
2 Comments
Joshua King
Executive Vice President at Select Mat AL, AR, FL, GA, IA, KS, LA, MO, MS, NM, NC, OK, PA, SC, TX, TN, Bad Golfer, Good Pickleball Player.
1w
- Report this comment
Congratulations!
1Reaction
Wendy Hollenbach
2w
- Report this comment
Exciting!
1Reaction
To view or add a comment, sign in
More Relevant Posts
-
The Vertex Companies LLC
20,791 followers
- Report this post
Navigating wetlands permitting regulations in Massachusetts demands a deep understanding of both state and local standards. As outlined in VERTEX's recent blog by Senior Project Manager, Andy Street, P.E., the complexities of these regulations are vast and varied. From delineating wetland resource areas to crafting detailed site design plans, each phase requires precision and expertise.Massachusetts' Wetlands Protection Act sets forth standards for protecting inland and coastal areas, with additional requirements often imposed by municipalities. Andy's blog sheds light on the nuances of these regulations, emphasizing the importance of thorough compliance to ensure successful project outcomes.Check out Andy's insightful blog and discover how VERTEX can support your project needs! Click below to read Andy’s full blog.#WetlandsPermitting #EnvironmentalCompliance #ExpertInsights #MassachusettsRegulations #EngineeringDesign #WeAreVertex
14
1 Comment
Like CommentTo view or add a comment, sign in
-
Aditya Suryavanshi
Merger & Acquisition/Realestate
- Report this post
The basic approvals developer's need for the project are:-1) Intimation of Disapproval2) Occupancy Certificate3) Commencement Certificate4) NA permission5) Tree Authority NOC 6) Sewage Dept NOC7) Hydraulic Dept NOC8) Environmental Clearance9) AAI NOC10) Ancient Monument Approval 11) Traffic & Cordination Dept NOC12) CRZ Clearance11) Permission for Excavation12) Structural Plan & Layout Approval13) Storm Water & Drain Dept NOC14) Fire NOCOccupation Certificate can be given based on the number of structures completed at a particular time period whereas a Commencement Certificate is usually given in parts. In case of any pending work to be alloted to Municipal Corporation the same can be communicated via letters to the concern department.#realestate #law #lawyersoffice #realestatecompany #work #courts #realestateattorney #realestateadvice #highcourt #supremecourt #lawstudents
22
Like CommentTo view or add a comment, sign in
-
Stone Equipment Co., Inc.
1,227 followers
- Report this post
🚧 Construction🔨 Demolition♻️ Environmental⚙️ Aggregate Tasks #constructionequipment #heavyequipment #heavyequipmentrentalservice #StoneEquipment #ArticulatedTrucks #ConstructionRentals
18
Like CommentTo view or add a comment, sign in
-
GeoAfrika Surveys
2,477 followers
- Report this post
Land development requires careful consideration of the site context, natural features, cultural features, environmental factors, and relevant legislation. The effective collation, interpretation, and presentation of a diverse range of professional reports is paramount in getting land development consent and is something we are well-versed in.https://lnkd.in/dPNRsugP#surveys #townplanning #civilengineers #engineers #construction
91
1 Comment
Like CommentTo view or add a comment, sign in
-
JC Environmental
640 followers
- Report this post
Important result for a sensitive ecosystem. Well done to all involved in this investigation from Waikato Regional Council.The length of time it took to get the result doesn’t take any shine away from this success. Compliance officers have to nativagate through a complex and lengthy regulatory system to bring issues such as this before a court. The environment can’t always speak for itself and regulators are key to giving it a voice.
12
2 Comments
Like CommentTo view or add a comment, sign in
-
Goldie Kay
LVI Associates Consultant | Civil Engineering - Water Infrastructure | Arizona & Nevada
- Report this post
Just read this article... interesting to see what the Senate is discussing related to the water engineering industry. Check it out!
9
Like CommentTo view or add a comment, sign in
-
JPS USA
66 followers
- Report this post
Expertise in Action: Specialized Right-of-Way Clearing for Pipelines and Utility Corridors by JPS USAAt JPS USA, we specialize in right-of-way clearing for pipelines and utility corridors, a critical task in land management that demands precision, safety, and environmental awareness. Based in the heart of Tennessee, we're committed to providing top-tier services in this essential sector, with a keen focus on compliance within the electrical industry.Why Specialized Clearing MattersClearing right-of-ways for utilities and pipelines involves more than just removing trees and underbrush. It’s about creating safe passages for the installation and maintenance of essential infrastructure like gas lines, electrical lines, and water systems, ensuring uninterrupted services to communities and industries.Our Comprehensive Approach- Precision and Planning: At JPS USA, we conduct thorough site assessments to plan our clearing operations meticulously, minimizing environmental impact and preserving nearby natural features.- Advanced Equipment and Techniques: Utilizing the latest equipment, including specialized mulchers and excavators, we efficiently clear vegetation and debris while ensuring the integrity of the underlying infrastructure.- Environmental Compliance and Stewardship: Our methods align with environmental regulations to protect local ecosystems. We focus on preventing soil erosion, protecting waterways, and preserving native wildlife habitats.- Compliance with Electrical Industry Standards: Adhering strictly to the safety and regulatory standards specific to the electrical industry, we maintain safe distances from power lines and ensure all personnel are trained in electrical safety practices.Our Services Extend Beyond Clearing:- Installation Preparation: Preparing land for new pipeline installations or utility line laying.- Ongoing Maintenance: Regular clearing for existing utility corridors to ensure safe and efficient operation.- Vegetation Management: Strategic removal or trimming of vegetation to prevent interference with utility lines.- Post-Clearing Land Restoration: Implementing erosion control measures and land restoration to maintain environmental balance after clearing activities.Partner with JPS USA:Understanding the critical nature of these infrastructure projects, JPS USA is dedicated to delivering services that prioritize safety, efficiency, and environmental responsibility. Our expertise in right-of-way clearing makes us an ideal partner for utility and pipeline projects in TennesseeLooking for a team that brings professionalism, precision, and compliance to every project? Contact JPS USA at James@jpsusa.us for a consultation. Let's discuss how we can support and contribute to the success of your next infrastructure project.Together, we're paving the way for progress and ensuring the seamless operation of vital services in Tennessee!
Like CommentTo view or add a comment, sign in
-
Sevenson Environmental Services Inc.
4,217 followers
- Report this post
Sevenson’s Raymark Superfund Site Project Team was honored to host the EPA’s New England Regional Administrator David W. Cash, along with members of the Connecticut Congressional delegation, the U.S. Army Corps of Engineers, the Connecticut Department of Energy and Environmental Protection, the Mayor of Stratford, and local community members to highlight the significant progress made at the Raymark Industries, Inc. Superfund Site under funding from the Bipartisan Infrastructure Law. The officials took a tour of the remediated properties to view the progress and participated in a roundtable conversation with local community members to discuss the positive impacts that the cleanup has had on the town. They also conducted a ceremonial removal of a Public Health Advisory sign which had been posted decades ago to warn against exposure to Raymark contamination in the upstream portion of Ferry Creek but is no longer needed now that this portion of the creek has been cleaned up."This unprecedented funding from the Bipartisan Infrastructure Law has allowed EPA and its partners to deliver on our promise to protect the community from legacy contamination, as well as cleanup and restore land for reuse in Stratford," said EPA New England Regional Administrator David W. Cash. "Though there's still a long road ahead of us, we're looking forward to continuing full steam ahead, restoring additional properties and bringing the Raymark cleanup to completion."Bipartisan Infrastructure Law funding for the Stratford, Connecticut site propelled the cleanup forward, thus far EPA and its partners have been able to complete the following activities:More than 100,000 cubic yards of contamination excavated and removed;28 properties cleaned up and restored, including 12 active businesses;1/3 of a mile of Ferry Creek cleaned up and working to restore the natural habitat by planting over an acre of wetland seed, live stakes, and nearly 1,000 trees and shrubs;More than 10,000 air samples collected from 9 monitoring stations to confirm the air remained safe;Provided 30 to 50 jobs each workday including engineers, scientists, machine operators, laborers and truck drivers.Thank you to all of our partners for continuing to make this a safe and successful project! #EnvironmentalRemediation #SafetyFirsthttps://lnkd.in/e_5GYCNd
80
5 Comments
Like CommentTo view or add a comment, sign in
-
Oldfields Australia Pty Ltd
17 followers
- Report this post
Easem*nt maintenance plays a crucial role in addressing various issues and ensuring the smooth functioning of utility corridors or access pathways across a property. Easem*nt maintenance resolves:🌱 Vegetation Management:Regular clearing and vegetation management helps prevent the overgrowth of trees, bushes, and other plants that could interfere with utility lines or impede access for maintenance crews.By keeping vegetation in check, the risk of service interruptions and potential hazards is minimised.🌱 Infrastructure Integrity:Over time, natural elements, erosion, and external factors can affect the integrity of the infrastructure within an easem*nt. Regular maintenance ensures that utility structures, such as pipelines or power lines, remain in good condition. This proactive approach helps prevent leaks, disruptions, or damage to essential services.🌱 Compliance with Regulations:Many properties have easem*nts designated for utilities, and compliance with legal and regulatory requirements is essential. Easem*nt maintenance ensures that property owners adhere to these regulations, avoiding potential legal issues. This includes keeping the easem*nt clear of structures or activities that could violate local codes.🌱 Access for Emergency Services:Easem*nts often serve as critical access routes for emergency services, such as fire, police, or utility repair crews. Proper maintenance ensures that these pathways remain accessible in times of need, enabling swift responses to emergencies. Unobstructed easem*nts can be vital for community safety and the protection of property.#Oldfields #Oldfieldsaustralia #forestrymulching #landclearing#easemanagement
Like CommentTo view or add a comment, sign in
-
Stormwater Professionals Group
551 followers
- Report this post
Stormwater Quality Permitting Process ChallengesThe major challenge we hear from customers who attempt to obtain a stormwater quality permit in Houston themselves, is that regulators are inconsistent in their approvals. This sometimes leads to rejecting permits this year when they approved the same permits last year.The problem is that compliance is often a judgment call on the regulators – who are only human. Because of this, compliance is often a moving target.Unfortunately, not knowing what is and isn’t compliant and hoping for the best can get you into legal trouble and jeopardize the engineer’s seal.https://lnkd.in/eevE5mka#stormwater #civilengineering #stormwaterprofessionalsgroup #harriscounty #houston
Like CommentTo view or add a comment, sign in
968 followers
- 228 Posts
View Profile
FollowExplore topics
- Sales
- Marketing
- Business Administration
- HR Management
- Content Management
- Engineering
- Soft Skills
- See All